For PMOs Managing Megaprojects Under Constraint
Flow measures how work moves through space, time, and shared services.
Unlike schedule % complete, flow KPIs expose the friction killing productivity.
These are the 12 critical flow indicators:
1️⃣ Gate Throughput Rate
How fast people/materials enter site
Formula:
Entries per hour ÷ Max safe capacity
Target: ≥ 85% efficiency
Why it matters: Anything below creates lost productive hours before the shift begins.
2️⃣ Time-to-Workspace
Travel + wait + clearance time to reach the job
Target: < 20 min from gate to tools-on
Why it matters: Every extra 10 min = 3–5% daily productivity loss.
3️⃣ Crew Productive Hour Ratio (CRU Signature KPI)
Formula:
Direct tools-on time ÷ Total shift time
Target: 65–70% (most sites sit < 45%)
Reveals: Congestion, poor coordination, waste.
4️⃣ Shared Service Wait Time
Lunchroom, elevators/hoists, washrooms, safety stations
Target: < 5% of total shift
Reveals: “Invisible congestion” bottlenecks.
5️⃣ Delivery Flow Adherence
How many deliveries arrive on time + correct + safe route
Target: 95%+
Impact: Smooth material availability = continuous workfronts.
6️⃣ Workfront Readiness Index
Are crews arriving to workfronts that are actually ready?
Target: ≥ 90% of planned shifts
Impact: Avoids “wandering craft” & idle crews.
7️⃣ Progress Confirmation Latency
Time from work completion → confirmation in system
Target: < 24 hours
Why: Delays break the Resource Intelligence Loop™.
8️⃣ Shift Flow Synchronization
Alignment between site access, shared services, and crew surge times
Target: Zero peak conflicts
Impact: Smooth day vs. disaster day.
9️⃣ Space Density Index
Trade workers per m² per hour
Target: Balanced density across zones
Why: Too high = safety risk & chaos. Too low = underutilization.
🔟 Material Touch Count
How many times a material is moved before installation
Target: 1–2 touches max
Impact: More touches = more wasted labour.
1️⃣1️⃣ Unplanned Relocation Events
Crew forced to move mid-shift due to access/priority changes
Target: Zero
Impact: Flow interrupter + morale killer.
1️⃣2️⃣ Logistics Interference Events
Incidents where movement stops movement
(e.g., forklift blocking forklift, trades blocking trades)
Target: Zero
Impact: The true congestion metric everyone ignores.
💡 The CRU Truth Behind These KPIs
Flow KPIs measure the friction schedule metrics hide.
If flow breaks, productivity breaks—no matter what P6 says.